Home > Maintenance Mode, Operations Manager 2007 > Scheduled Maintenance Mode – scalability considerations

Scheduled Maintenance Mode – scalability considerations

Suggested Support numbers are as follows:

  • Up to 20 jobs per management group
  • Up to 10 items (computer, group, other class) in a job. If you would like to schedule 1000 agents you should place them in a group.

There does seem to be an issue with trying to modify jobs that have more than 6 objects – I have found (and others have been able to replicate) that when you try and modify the job details, an error is thrown and the schedule is blank (and can’t be re-added). A fix is in the pipeline so stay tuned if you are affected by this.

Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: